Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function

Título
Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
Tipo
Artigo em Livro de Atas de Conferência Internacional
Ano
2016-11-07
Autores
João Tomé Saraiva
(Autor)
FEUP
Manuel Castro
(Autor)
FEUP
Ver página pessoal Sem permissões para visualizar e-mail institucional Pesquisar Publicações do Participante Sem AUTHENTICUS Sem ORCID
José Carlos Sousa
(Autor)
Outra
Indexação
Publicação em ISI Web of Knowledge ISI Web of Knowledge
Publicação em Scopus Scopus
INSPEC
Classificação Científica
CORDIS: Ciências Tecnológicas > Engenharia > Engenharia electrotécnica
FOS: Ciências da engenharia e tecnologias > Engenharia electrotécnica, electrónica e informática
Outras Informações
Abstract (EN): The restructuring of power systems induced new challenges to generation companies in terms of adequately planning the operation of power stations in order to maximize their profits. In this scope, hydro resources are becoming extremely valuable given the revenues that their operation can generate. In this paper we describe the application of the Matlab® Linprog optimization function to solve the Short Term Hydro Scheduling Problem, HSP, admitting that some stations are installed in the same cascade and that some of them have pumping capabilities. The optimization module to solve the HSP problem is then integrated in an iterative process to take into account the impact that the operation decisions regarding the hydro stations under analysis have on the market prices. The updated market prices are then used to run again the HSP problem thus enabling considering the hydro stations as price makers. The developed approach is illustrated using a system based on the Portuguese Douro River cascade that includes 9 hydro stations (4 of them are pumping stations) and a total installed capacity of 1485 MW.
Idioma: Inglês
Tipo (Avaliação Docente): Científica
Nº de páginas: 6
Documentos
Nome do Ficheiro Descrição Tamanho
MEDPOWER2016_MCastro_V2 281.62 KB
Recomendar Página Voltar ao Topo
Copyright 1996-2024 © Faculdade de Medicina da Universidade do Porto  I Termos e Condições  I Acessibilidade  I Índice A-Z  I Livro de Visitas
Página gerada em: 2024-10-06 às 07:45:13
Política de Utilização Aceitável | Política de Proteção de Dados Pessoais | Denúncias | Política de Captação e Difusão da Imagem Pessoal em Suporte Digital