Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Project/Service Agreement:PTDC/ECM/68430/2006

Project/Service Agreement:PTDC/ECM/68430/2006

Start Approved In Progress Completed Closed

Status
Projeto EncerradoClosed
Publication
PublicadoPublished
General Data
Code: 63615
 
Reference: PTDC/ECM/68430/2006
Short name: PTDC/ECM/68430/2006
Title: Continuous precast bridge decks for railway bridges: numerical and experimental assessment
Competitive Funding: Yes
Does it involve businesses?:
No. of Participating Institutions: 3
Scope
Type: Funded Project
 
Geographical Scope: National
 
Type of Action: R&TD
Funding
Programme: I&DT - Projectos de I&DT em Todos os Domínios Científicos
Funding Institution: FCT - Fundação para a Ciência e a Tecnologia
Financial Geographical Scope: National
Scheduling
Effective Start Date: 2008-01-01
Expected Completion Date: 2010-12-31
Effective Completion Date: 2011-06-30
Budget
Currency: EUR
 
Total Approved Budget: 90.000,00 EUR
Details
Summary: This project focuses on continuous bridge decks constructed with precast beams (each beam having a length similar to the span length) transversally connected by a thin slab.
One particular type of continuous precast bridge decks, which has been criticized by the technical community, will be analyzed in this project: those constructed with precast girders monolithically connected above the supports, where the negative moment reinforcement is composed by ordinary reinforcement bars only, i.e., without continuity prestress. This solution has been adopted in the French and Spanish HSLs for the construction of bridge decks with span lengths up to 38 m, because its construction is simpler, faster and cheaper then the construction of bridge decks with continuity prestress.
This technique has been most criticized because of the absence of prestress in the negative moment region. The adoption of this solution for railway bridges (where high variable loads occur, and both the rail safety and passenger comfort are highly dependent on structural stiffness) raises more doubts for some authors (it is said that important crack opening and loss of structural stiffness may occur due to the absence of prestress in the negative moment region). In spite of that, there is no sound evidence that this solution leads to a bad structural performance. The insufficiency of rules in design codes, regarding the specificity of precast structures, has contributed for maintaining doubts about the performance of this solution. Considering the relevance of continuous precast bridge decks for the construction of medium span bridges, it is urgent to clarify the doubts concerning their performance.
This project was also motivated by the need for improving the knowledge (particularly in Portugal) about the fatigue phenomenon in HSL continuous precast bridges. Indeed, for concrete structures, the fatigue phenomenon is only relevant if there is a high (cyclic) variable load / permanent load ra Ver mais. Adequado para parcelas de texto incompletas e que, através deste ícone, permite-se que o utilizador leia o texto todo.
URL: http://www.fct.mctes.pt/projectos/pub/2006/Painel_Result/vglobal_projecto.asp?idProjecto=68430&idElemConcurso=883
Scientific Context
Scientific Domain (FOS - Level 2): Engineering and technology > Civil engineering

Academic fields (CORDIS - Level 5)

  • Social sciences > Economics > Management studies
  • Technological sciences > Engineering > Civil engineering > Infrastructures engineering

Keywords

  • Comportamento dinâmico
  • Experimentação e modelação
  • Fissuração e fadiga
  • Tabuleiros pré-fabricados de pontes
Documents
Mais informações There are no Documents associated with the Project.

Publications associated with the Project

Institutions Participating in the Project
Institution Contact Create Tab?
Name Short name Country Type Participation Name Telephone Email
Faculdade de Engenharia da Universidade do Porto FEUP Portugal University Proponent António Serra Neves asneves@fe.up.pt
Rede Ferroviária de Alta Velocidade, S.A. RAVE Portugal Company Partner
Rede Ferroviária Nacional, REFER EP REFER Portugal Status Partner
 
Budgets and Teams
Approved Budget: 90.000,00 EUR
Approved Funded Amount: 90.000,00 EUR
Approved co-funded Amount: -
Funding Rate: -
Confidential Budget:

People in the Project

Institution Name Short name Role Dedication (%) Contribution (%) Allocation
Start date End date
FEUP Afonso António de Serra Neves ASN Official Researcher at the OU 35 20
FEUP Carlos Filipe Ferreira de Sousa CFFS Researcher 100 55
FEUP Raimundo Moreno Delgado RD Researcher 15 5
FEUP Rui Artur Bártolo Calçada RBC Researcher 20 20

Technicians in the Project

Mais informações There are no Technicians associated with the Project.
Laboratories
Mais informações There are no Laboratories associated with the Project.
Recommend this page Top