Performance Assessment of Existing Structures
| Keywords |
| Classification |
Keyword |
| OFICIAL |
Civil Engineering - Structures |
Instance: 2010/2011 - 2S
Cycles of Study/Courses
| Acronym |
No. of Students |
Study Plan |
Curricular Years |
Credits UCN |
Credits ECTS |
Contact hours |
Total Time |
| PRODEC |
0 |
Syllabus since 2007/08 |
1 |
- |
5 |
45 |
135 |
Teaching language
Portuguese
Program
Structural reinforcement by addition of FRP composite systems;
Technique: application procedures, cementing techniques by EBR and NSM, control and quality assurance requirements, conformity tests, observation and supervision of reinforced structures;
Dimensioning: dimensioning criteria of a reinforcement project with FRP composite systems. Bending, cut and confinement reinforcement;
Requirements specification: specifications for the conformities construction and control in reinforcement works with FPR systems (Conformity Plans and Waste Management Plans); Diagnosis electrochemical techniques; electrochemical repair techniques (cathodic protection, chloride extraction, realkalinization). Durability monitoring. Non-electrochemical sensors (anode-ladder system, resistivity and chlorides, multi-circle electrodes, macrocell corrosion and relative humidity).
Electrochemical sensors.
Evaluation Type
Evaluation with final exam