Saltar para:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Início > Publicações > Visualização > Short term operation planning of hydro stations considered as price makers using the matlab Linprog® function
Mapa das Instalações
Edifício Principal | Main Building Edifício Pós-Graduações | Post-Graduate Building

Short term operation planning of hydro stations considered as price makers using the matlab Linprog® function

Título
Short term operation planning of hydro stations considered as price makers using the matlab Linprog® function
Tipo
Artigo em Livro de Atas de Conferência Internacional
Ano
2016
Autores
Castro, M
(Autor)
Outra
A pessoa não pertence à instituição. A pessoa não pertence à instituição. A pessoa não pertence à instituição. Sem AUTHENTICUS Sem ORCID
João Tomé Saraiva
(Autor)
FEUP
Sousa, JC
(Autor)
Outra
A pessoa não pertence à instituição. A pessoa não pertence à instituição. A pessoa não pertence à instituição. Sem AUTHENTICUS Sem ORCID
Ata de Conferência Internacional
Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion, MedPower 2016
6 November 2016 through 9 November 2016
Indexação
Publicação em Scopus Scopus - 0 Citações
Outras Informações
ID Authenticus: P-00M-H4T
Abstract (EN): The restructuring of power systems induced new challenges to generation companies in terms of adequately planning the operation of power stations in order to maximize their profits. In this scope, hydro resources are becoming extremely valuable given the revenues that their operation can generate. In this paper we describe the application of the Matlab® Linprog optimization function to solve the Short Term Hydro Scheduling Problem, HSP, admitting that some stations are installed in the same cascade and that some of them have pumping capabilities. The optimization module to solve the HSP problem is then integrated in an iterative process to take into account the impact that the operation decisions regarding the hydro stations under analysis have on the market prices. The updated market prices are then used to run again the HSP problem thus enabling considering the hydro stations as price makers. The developed approach is illustrated using a system based on the Portuguese Douro River cascade that includes 9 hydro stations (4 of them are pumping stations) and a total installed capacity of 1485 MW.
Idioma: Inglês
Tipo (Avaliação Docente): Científica
Documentos
Não foi encontrado nenhum documento associado à publicação.
Recomendar Página Voltar ao Topo
Copyright 1996-2024 © Faculdade de Economia da Universidade do Porto  I Termos e Condições  I Acessibilidade  I Índice A-Z  I Livro de Visitas
Página gerada em: 2024-09-29 às 02:22:30 | Política de Utilização Aceitável | Política de Proteção de Dados Pessoais | Denúncias
SAMA2