Saltar para:
Logótipo
Você está em: Início > Publicações > Visualização > Optimal Sizing and Siting of Electrical Energy Storage Devices for Smart Grids Considering Time-of-Use Programs

Optimal Sizing and Siting of Electrical Energy Storage Devices for Smart Grids Considering Time-of-Use Programs

Título
Optimal Sizing and Siting of Electrical Energy Storage Devices for Smart Grids Considering Time-of-Use Programs
Tipo
Artigo em Livro de Atas de Conferência Internacional
Ano
2019
Autores
Mohammad Sadegh Javadi
(Autor)
Outra
A pessoa não pertence à instituição. A pessoa não pertence à instituição. A pessoa não pertence à instituição. Ver página do Authenticus Sem ORCID
Kimia Firuzi
(Autor)
Outra
A pessoa não pertence à instituição. A pessoa não pertence à instituição. A pessoa não pertence à instituição. Sem AUTHENTICUS Sem ORCID
Maedeh Rezanejad
(Autor)
Outra
A pessoa não pertence à instituição. A pessoa não pertence à instituição. A pessoa não pertence à instituição. Sem AUTHENTICUS Sem ORCID
Mohamed Lotfi
(Autor)
Outra
A pessoa não pertence à instituição. A pessoa não pertence à instituição. A pessoa não pertence à instituição. Ver página do Authenticus Sem ORCID
Matthew Gough
(Autor)
Outra
A pessoa não pertence à instituição. A pessoa não pertence à instituição. A pessoa não pertence à instituição. Sem AUTHENTICUS Sem ORCID
Outras Informações
ID Authenticus: P-00R-R6H
Abstract (EN): This paper focuses on the long-term planning of power systems considering the impacts of Electrical Energy Storage Devices (ESSD) as well as Demand Response Programs (DRPs). The proposed model incorporates a two-stage optimization strategy in order to reduce the computational burden of the nonlinear problem. The upper-level of optimization model includes investment decision variables (long-term planning) while in the lower-level, the optimal operation of the model for short-term horizon has been addressed. In the operational stage, the optimal scheduling of power system in the presence of suggested ESSD size and location from the upper level is evaluated. Moreover, the Time-of-Use (ToU) Demand Response (DR) pricing scheme has been applied in the operational stage to evaluate its capability to reduce the total operating costs. The simulation results on the standard 6-bus test system validates the applicability of the proposed two-stage optimization model and illustrates that the optimal sizing and location of ESSDs along with DRP implementation could effectively reduce the total systems costs and improve the power system load factor.
Idioma: Inglês
Tipo (Avaliação Docente): Científica
Nº de páginas: 6
Documentos
Não foi encontrado nenhum documento associado à publicação.
Recomendar Página Voltar ao Topo
Copyright 1996-2024 © Faculdade de Engenharia da Universidade do Porto  I Termos e Condições  I Acessibilidade  I Índice A-Z  I Livro de Visitas
Página gerada em: 2024-10-06 às 14:03:43 | Política de Utilização Aceitável | Política de Proteção de Dados Pessoais | Denúncias