Go to:
Logótipo
You are here: Start > EC0045

Construction Processes

Code: EC0045     Acronym: PCON

Keywords
Classification Keyword
OFICIAL Materials

Instance: 2007/2008 - 2S

Active? Yes
Responsible unit: Construction Materials Division
Course/CS Responsible: Master in Civil Engineering

Cycles of Study/Courses

Acronym No. of Students Study Plan Curricular Years Credits UCN Credits ECTS Contact hours Total Time
MIEC 17 Syllabus since 2006/2007 5 - 5 52,5 133

Teaching language

Portuguese

Objectives

To teach techniques of construction to enable the student to chose the most adequate construction process and equipment for the jobsite.


Program

Aggregates
 Aggregates production operation including blasting, crushing and conveying systems.
 Aggregates from by-products.
 Explosives.
 Crushing and screening mobile equipment.

Construction equipment

Concrete
 Mixing equipment; mixer performance; general requirements.
 Transporting.
 Placing including special process (e.g. preplaced aggregate concrete, underwater concreting, concreting with tremie pipes).
 Preparation of surfaces and reinforcement; joint preparation.
 Methods of consolidation: form vibrators, vibrating tables, surface vibrators, internal vibrators; slipforming; pressure against formwork.
 Revibration.
 Curing and protection: normal curing, accelerated curing; influence of the curing temperature on the strength and durability.
 Concrete temperature control: pre-cooling, post-cooling and insulating systems.
 Shotcrete: general equipment.
 White concrete: mixing, transporting and placing.

Concrete formwork
 Materials for formwork; special types; forms for site precasting; form release agents - influence on the concrete surface.

Lightweight slabs
 Waffle slabs.

Soil improvement
 Injection: equipment, methods and materials.
 Jet-grouting.
 Drainage systems.
 Soil freezing technology.

Anchoring
 Construction practice, equipment, materials, evaluation of the performance of post install mechanical anchors.

Bridges
 Methods employed in bridge construction.

Tunneling
 Blasting, mining and drilling equipment.
 Tunnel Boring Machines.
 NATM - New Austrian Tunneling Method.
 Underground vehicles.
 Lining: shotcrete, cast-in-place concrete and pre-cast concrete rings.

Shafts and chimneys
 Shaft drilling.
 Shaft boring.
 Raise boring.

Uncommon architectonic buildings
 Construction processes.

Teaching methods and learning activities

Theoretical and pratical lectures; field trips.

Evaluation Type

Evaluation with final exam

Eligibility for exams

Presence in the lectures and at the field trips.

Calculation formula of final grade

Final exam.

Special assessment (TE, DA, ...)

Final exam.

Classification improvement

Final exam.

Observations

...........................................................
Estimated working time out of classes: 4 hours
Recommend this page Top
Copyright 1996-2024 © Faculdade de Engenharia da Universidade do Porto  I Terms and Conditions  I Accessibility  I Index A-Z  I Guest Book
Page generated on: 2024-07-19 at 18:22:49 | Acceptable Use Policy | Data Protection Policy | Complaint Portal