Go to:
Logótipo
You are here: Start > EEC0123

Design and Development of Electrical Project

Code: EEC0123     Acronym: CPRO

Keywords
Classification Keyword
OFICIAL Power

Instance: 2014/2015 - 1S

Active? Yes
Responsible unit: Department of Electrical and Computer Engineering
Course/CS Responsible: Master in Electrical and Computers Engineering

Cycles of Study/Courses

Acronym No. of Students Study Plan Curricular Years Credits UCN Credits ECTS Contact hours Total Time
MIEEC 27 Syllabus 5 - 6 56 162

Teaching language

Portuguese

Objectives

The aim of this course is the performance of two projects: a 60 kV overhead transmission line and a 60/15 kV or 60/30 kV distribution substation. Students should be capable of developing a licensing project to these types of electrical installations.

Learning outcomes and competences

1. Acquisition and demonstration of advanced knowledge on the constitution, functioning and implementation of two projects electric (Line and Substation AT) (CDIO Syllabus 1.3, 2.1, 2.3, 2.4, 2.5,3.1);

2. Demonstration of capacity for treatment, validation and interpretation of results in practical work (CDIO Syllabus 1.3, 2.1, 2.3, 3.2);

3. capacity development of autonomous work and literature (CDIO Syllabus 2.4);

4. demonstration of ability to integrate and carry out work in a team and the planning and development of joint work (CDIO Syllabus 2.4 and 2.5);

5. development and demonstration of capabilities for the production of written reports;

6. Demonstration of understanding of the external contexts, business and commercial moves that currently the electricity sector (CDIO Syllabus 4.1, 4.2, 4.3 and 4.4);

7. demonstration of skills related to setting objectives to the design and management of projects (CDIO Syllabus 4.3, 4.4).

Working method

Presencial

Program

This course is divided into two parts:

1. Design of a high voltage overhead transmission line:
Objective: to design a 60 kV overhead transmission line;
Methodology: Analysis of the legal framework; use of topographic maps; route; electrical calculation and conductors; mechanical calculation; project brief

2. Design of a distribution substation:
Objective: to change the voltage level of an industrial facility
Methodology: Analysis of the substation; element constitution; equipments; ground networks; interlocking

Mandatory literature

Regulamento de segurança de linhas eléctricas de alta tensão : decreto n.º 46847, de 27 de Janeiro de 1966.- Lisboa : Imprensa Nacional, 1971.- 88 p. ; 21 cm
Luís Checa; Linhas de Transporte de Energia, Tito Lyon de Castro. ISBN: 9726410983
EDP distribuição; Memória descritiva projecto-tipo subestações AT/MT (DIT-C13-500/N)
Regulamento de Segurança de Subestações e Postos de Transformação e de Seccionamento, Colectânea Construir - Instalações Eléctricas
BBC,Manual de Instalações Eléctricas, Ed. Ordem dos Engenheiros – Região norte.

Teaching methods and learning activities

At the beginning of each project, it will be given some theoretical classes to present essential themes, regarding installation, regulations and calculation.
The projects have to be performed by groups of three students during theoretical-practical classes.

Software

AutoCAD Electrical
Geo-Slope Office

keywords

Technological sciences
Technological sciences > Engineering > Electrical engineering

Evaluation Type

Distributed evaluation without final exam

Assessment Components

Designation Weight (%)
Participação presencial 20,00
Trabalho escrito 80,00
Total: 100,00

Eligibility for exams

Students have to reach a passing grade in both projects.

Calculation formula of final grade

Final Mark will be based on the average mark of both projects.

Examinations or Special Assignments

Not applicable

Special assessment (TE, DA, ...)

Assignments

Classification improvement

Extra assignments

Recommend this page Top
Copyright 1996-2024 © Faculdade de Engenharia da Universidade do Porto  I Terms and Conditions  I Accessibility  I Index A-Z  I Guest Book
Page generated on: 2024-08-20 at 22:54:04 | Acceptable Use Policy | Data Protection Policy | Complaint Portal