Go to:
Logótipo
You are here: Start > EC0039

Roads II

Code: EC0039     Acronym: VCOM2

Keywords
Classification Keyword
OFICIAL Transport Infrastructures

Instance: 2006/2007 - 2S

Active? Yes
Responsible unit: Transport Infrastructures Division
Course/CS Responsible: Master in Civil Engineering

Cycles of Study/Courses

Acronym No. of Students Study Plan Curricular Years Credits UCN Credits ECTS Contact hours Total Time
LEC 6 Plano de estudos de transição para 2006/07 4 6,5 6,5 75 174
MIEC 212 Syllabus since 2006/2007 4 - 6,5 75 174
Plano de estudos de transição para 2006/07 4 - 6,5 75 174

Teaching language

Portuguese

Objectives

Discipline of general characteristics in the area of Road Design, Earthworks, Drainage and Pavements

Program

- Cross section of a Road: characteristcs of roadway, bends and drainage structures.
- Traffic: basics about capacity.
Earthworks: earth volumes and earth distribution (Bruckner).
-Soils: Proctor and C.B.R. tests.
- Basics about pavements.

Main Bibliography

Apontamentos de Vias de Comunicação
Normas do Traçado Rodoviário.

Teaching methods and learning activities

General exposures for theoretical classes. Resolution of practical problems for practical classes.

Evaluation Type

Distributed evaluation with final exam

Assessment Components

Description Type Time (hours) Weight (%) End date
Subject Classes Participação presencial
Total: - 0,00

Eligibility for exams

It is applicable the general rule.

Calculation formula of final grade

CF = (1.2 x CT + 0,6 x CP + 0,2 x CTP) /2
CF = final classification
CT = theoreetical part of final test
CP = pratic part of final test
CTP = pratical work final classification

Special assessment (TE, DA, ...)

It is applicable the general rule.

Observations

.........................................................
Working time estimated out of class: 4 hours
Recommend this page Top
Copyright 1996-2024 © Faculdade de Engenharia da Universidade do Porto  I Terms and Conditions  I Accessibility  I Index A-Z  I Guest Book
Page generated on: 2024-07-17 at 08:18:27 | Acceptable Use Policy | Data Protection Policy | Complaint Portal