Go to:
Logótipo
You are here: Start > Publications > View > LCA of Two Pipe Installation Methods: Open-Cut vs Tunnelling, for a Desalination Plant Scenario
B-On anuncia condições para publicação em Acesso Aberto no triénio 2025-2027
Publication

LCA of Two Pipe Installation Methods: Open-Cut vs Tunnelling, for a Desalination Plant Scenario

Title
LCA of Two Pipe Installation Methods: Open-Cut vs Tunnelling, for a Desalination Plant Scenario
Type
Thesis
Year
2024-10-11
Authors
David Tadeo Esquer Covarrubias
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications Without AUTHENTICUS Without ORCID
Scientific classification
FOS: Engineering and technology > Civil engineering
Other information
Language: English
No. of pages: 124
Documents
File name Description Size
MBUILD_2324_LCAofTwoPipeInstallationMethods_David Esquer_Final LCA OF TWO PIPE INSTALLATION METHODS: OPEN-CUT VS TUNNELLING, FOR A DESALINATION PLANT SCENARIO 5147.70 KB
Recommend this page Top
Copyright 1996-2025 © Faculdade de Engenharia da Universidade do Porto  I Terms and Conditions  I Accessibility  I Index A-Z  I Guest Book
Page generated on: 2025-06-24 at 08:40:50 | Acceptable Use Policy | Data Protection Policy | Complaint Portal