Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Project/Service Agreement:POCI/ECM/57286/2004

Project/Service Agreement:POCI/ECM/57286/2004

Start Approved In Progress Completed Closed

Status
Estado ConcluídoCompleted
Publication
PublicadoPublished
General Data
Code: 63410
 
Reference: POCI/ECM/57286/2004
Short name: POCI/ECM/57286/2004
Title: Assessment of the Structural Integrity of Metalic Railway Bridges
Competitive Funding: Yes
Does it involve businesses?:
No. of Participating Institutions: 1
Scope
Type: Funded Project
 
Geographical Scope: National
 
Type of Action: R&TD
Funding
Programme: I&DT - Projectos de I&DT em Todos os Domínios Científicos
Funding Institution: FCT - Fundação para a Ciência e a Tecnologia
Financial Geographical Scope: National
Scheduling
Effective Start Date: 2005-06-01
Expected Completion Date: 2008-05-31
Effective Completion Date: 2008-05-31
Budget
Currency: EUR
 
Total Approved Budget: 90.000,00 EUR
Details
Summary: This research project aims the development and application of procedures for evaluation of the structural integrity of metallic railway bridges, taking in consideration the fatigue damage that can be induced by the large number of loading cycles applied during their life time.
The project will be conducted by a team of Structural Engineers of FEUP, in collaboration with colleagues from the Mechanical Engineering Department with great expertise in the field of fatigue. The research work will be focused on an old railway bridge of REFER, comprising the following main vectors:
a) Systematization of the most relevant and updated scientific and technical information, as well as of data and results concerning fatigue studies in metallic bridges with riveted or bolted joints;
b) Characterization of the historic evolution of the railway traffic loads during the bridge life time, and subsequent assumption of realistic load scenarios for the development of numerical simulations of the structural behaviour;
c) Assessment of the geometrical and mechanical characteristics of the bridge and development of 2D and 3D finite element models for characterization of the static and dynamic structural behaviour and identification of critical zones from fatigue point of view. Evaluation of the structural response of the bridge induced by railway traffic loads corresponding to the load scenarios used to appropriately characterize the past and future traffic flow on the bridge;
d) Temporary monitoring of the static and dynamic structural behaviour of the bridge, so as to experimentally validate the numerical simulations by correlating measured and calculated values. Performance of an ambient vibration test and a static load test, measuring structural deformations, rotations and displacements under thermal and current railway loads;
e) Use of all the relevant parameters of the bridge (static and dynamic), identified and quantified during the monitoring phase, in order to introduce a Ver mais. Adequado para parcelas de texto incompletas e que, através deste ícone, permite-se que o utilizador leia o texto todo.
Results: In 1997, the Portuguese Railway Network comprehended about 787 metallic bridges from a total of 2009 railway bridges. The total length of the metallic bridges was 23.4km, while the total length of the remaining concrete and masonry bridges was inferior to 15km. Beyond that, it must be noted that more than 16km of those metallic railway bridges were then already older than 60 years, being regularly submitted to load cycles than can induce fatigue damage. These figures clearly show the social and economical importance of developing an appropriate and reliable inspection and maintenance of old metallic railway bridges, allowing to guarantee acceptable safety levels. Therefore, the present project will certainly have a very positive repercussion in this field, by developing an experimentally and numerically tested methodology for the assessment of the structural integrity, establishing general Guidelines for the evaluation of the fatigue residual life of metallic railway bridges, which can be included in Manuals for Inspection and Maintenance of Metallic Bridges. Moreover, the project will lead to the obtainment, at FEUP, of a solid scientific competence in the area of Fatigue in Old Metallic Railway Bridges, as well as the development of new Ph.D and M.Sc. Research works (on the topics of Structural Health Monitoring, Fatigue Damage Assessment, Output-Only Modal Identification and Measurement of Dynamic Strains). The expertise achieved in this area will certainly allow to extend subsequently the research work to neighbour fields, related with the assessment of fatigue problems in new high speed railway bridges (where dynamic problems associated to resonant behaviour can play an important role) or to metallic roadway bridges.
Observations: Associado a este projecto existe um protocolo de cooperação da FEUP com a REFER (referência: Feup/Refer/2006)
URL: http://www.fct.mctes.pt/projectos/pub/2004/painel_result/vglobal_projecto.asp?idProjecto=57286&idElemConcurso=43
Scientific Context
Scientific Domain (FOS - Level 2): Engineering and technology > Civil engineering

Academic fields (CORDIS - Level 5)

  • Technological sciences > Engineering > Civil engineering > Structural engineering

Keywords

Mais informações There are no Keywords associated with the Project.
Documents
Mais informações There are no Documents associated with the Project.

Publications associated with the Project

Institutions Participating in the Project
Institution Contact Create Tab?
Name Short name Country Type Participation Name Telephone Email
Faculdade de Engenharia da Universidade do Porto FEUP Portugal University Coordinator Álvaro Cunha 225081580 acunha@fe.up.pt
 
Budgets and Teams
Approved Budget: 90.000,00 EUR
Approved Funded Amount: -
Approved co-funded Amount: -
Funding Rate: -
Confidential Budget:

People in the Project

Institution Name Short name Role Dedication (%) Contribution (%) Allocation
Start date End date
FEUP Álvaro Alberto de Matos Ferreira da Cunha AMC Official Researcher at the OU 40 50
FEUP António Augusto Fernandes aaf Researcher 10 10
FEUP Carlos Manuel Ramos Moutinho CRM Researcher 0 10
FEUP Elsa de Sá Caetano ESC Researcher 10 10
FEUP Filipe Manuel Rodrigues Leite Magalhães FMLM Researcher 25 10
FEUP Joaquim de Azevedo Figueiras JF Researcher 10 10
FEUP Paulo Manuel Salgado Tavares de Castro PTC Researcher 10 0

Technicians in the Project

Mais informações There are no Technicians associated with the Project.
Laboratories
Mais informações There are no Laboratories associated with the Project.
Recommend this page Top
Copyright 1996-2024 © Reitoria da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2024-10-02 10:52:21 | Acceptable Use Policy | Data Protection Policy | Complaint Portal