Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Publications > View > The Viana footbridge: construction and dynamic monitoring
Publication

The Viana footbridge: construction and dynamic monitoring

Title
The Viana footbridge: construction and dynamic monitoring
Type
Article in International Scientific Journal
Year
2013
Authors
R. Barbosa
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
F. Magalhães
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page Without ORCID
E. Caetano
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page View ORCID page
Á. Cunha
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page Without ORCID
Journal
Vol. 166 No. 4
Pages: 273-290
ISSN: 1478-4637
Indexing
Publicação em ISI Web of Knowledge ISI Web of Knowledge
Scientific classification
FOS: Engineering and technology > Civil engineering
CORDIS: Technological sciences > Engineering > Civil engineering > Structural engineering
Other information
Authenticus ID: P-009-6PB
Abstract (EN): A new moveable footbridge was recently built at the entrance of Marina Atlantico in the city of Viana do Castelo, Portugal. This paper presents a brief description of the global solution, with a special focus on the characterisation of the construction methods adopted. Particular consideration is given to the construction of the pivot pylon and the steel structure, showing how all the bridge components work together to ensure a safe working relationship with the marina, the river and users of the continuous bicycling and pedestrian pathway running across the closed bridge. The mechanical, hydraulic, electrical and navigational light systems play fundamental roles, especially during bridge opening and closing operations. Moreover, as this light footbridge is susceptible to vibrations due to human traffic, the paper also describes the dynamic tests performed during and after construction, including two ambient vibration tests, the measurement of cable-stay forces, and tests with groups of pedestrians used to evaluate induced vibration levels along with the monitoring of bridge accelerations over 4 months of use.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 18
License type: Click to view license CC BY-NC
Documents
File name Description Size
Paper published_Viana 7330.59 KB
Related Publications

Of the same journal

Assessment of an existing fully prestressed box-girder bridge (2017)
Article in International Scientific Journal
Mário Pimentel; Joaquim Figueiras
Recommend this page Top
Copyright 1996-2025 © Instituto de Ciências Biomédicas Abel Salazar  I Terms and Conditions  I Acessibility  I Index A-Z
Page created on: 2025-07-01 at 04:17:48 | Acceptable Use Policy | Data Protection Policy | Complaint Portal