Development and Assessment of a Hybrid Breakwater-Integrated Wave Energy Converter

Título
Development and Assessment of a Hybrid Breakwater-Integrated Wave Energy Converter
Tipo
Artigo em Revista Científica Internacional
Ano
2022-12
Autores
Ajab G. Majidi
(Autor)
Outra
José Victor Ramos
(Autor)
FEUP
Ver página pessoal Sem permissões para visualizar e-mail institucional Pesquisar Publicações do Participante Sem AUTHENTICUS Sem ORCID
Gianmaria Giannini
(Autor)
FEUP
Ver página pessoal Sem permissões para visualizar e-mail institucional Pesquisar Publicações do Participante Sem AUTHENTICUS Sem ORCID
Francisco Taveira Pinto
(Autor)
FEUP
Revista
A Revista está pendente de validação pelos Serviços Administrativos.
Vol. 15
Páginas: 281-291
Indexação
Publicação em Scopus Scopus
Classificação Científica
CORDIS: Ciências Tecnológicas
FOS: Ciências da engenharia e tecnologias
Outras Informações
ID Authenticus: P-010-4H3
Abstract (EN): <jats:p>Harnessing and using marine renewable energy at seaports is a promising solution to put these energy-intensive infrastructures on the right track to energy self-sufficiency and environmental sustainability, reducing their carbon footprint. This paper presents a summary of the main conclusions and achievements of a recently concluded R&D project that encompassed the experimental study of an innovative hybrid wave energy converter integrated into a case-study rubble-mound breakwater in the Port of Leixões, Portugal. It also describes the prospective studies planned in two ongoing projects, PORTOS ¿ Ports Towards Energy Self-Sufficiency and WEC4Ports ¿ A hybrid Wave Energy Converter for Ports, intended to further develop and assess this promising technology. It has been demonstrated that its wave-to-wire efficiency and annual energy production are 27.3% and 35.0 MWh/m per year, respectively, for the case-study location. Hence, a 240 m long device could provide more than half of the port¿s electricity consumption, which vows for the device¿s potential. Moreover, the impact of its integration into the case-study breakwater showed that it leads to a 50% reduction of overtopping discharges over the structure, and no significant effects on the structure¿s wave reflection, although the stability of the toe berm blocks was negatively impacted. Overall, the conclusions obtained are favourable to the integration of this technology into rubble-mound breakwaters. Notwithstanding, further research is still needed, namely in terms of wave forces acting upon the structure, important for the assessment of the functional performance and lifecycle readiness of the technology, and the use of PTO control strategies. This is being addressed in PORTOS and WEC4Ports projects.</jats:p>
Idioma: Inglês
Tipo (Avaliação Docente): Científica
Documentos
Não foi encontrado nenhum documento associado à publicação com acesso permitido.
Publicações Relacionadas

Dos mesmos autores

Numerical and physical modelling assessment of wave energy converters in the North Breakwater of the Port of Leixões (2022)
Artigo em Livro de Atas de Conferência Internacional
Victor Ramos; Tomás Calheiros Cabral; Gianmaria Giannini; Ajab Majidi; Luciana das Neves; Paulo Rosa Santos; Francisco Taveira Pinto
Development and Assessment of a Hybrid Breakwater-Integrated Wave Energy Converter (2021)
Artigo em Livro de Atas de Conferência Internacional
Tomás Calheiros Cabral; Ajab Majidi; Victor Ramos; Gianmaria Giannini; Paulo Rosa Santos; Francisco Taveira Pinto
Recomendar Página Voltar ao Topo
Copyright 1996-2024 © Faculdade de Direito da Universidade do Porto  I Termos e Condições  I Acessibilidade  I Índice A-Z  I Livro de Visitas
Página gerada em: 2024-10-20 às 12:02:02 | Política de Utilização Aceitável | Política de Proteção de Dados Pessoais | Denúncias