Go to:
Logótipo
You are in:: Start > Publications > View > Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
Map of Premises
FC6 - Departamento de Ciência de Computadores FC5 - Edifício Central FC4 - Departamento de Biologia FC3 - Departamento de Física e Astronomia e Departamento GAOT FC2 - Departamento de Química e Bioquímica FC1 - Departamento de Matemática
Publication

Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups

Title
Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
Type
Article in International Scientific Journal
Year
2011
Authors
António Aroso Menezes
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Alistair Clark
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Journal
Title: Journal of SchedulingImported from Authenticus Search for Journal Publications
Vol. 14 No. 2
Pages: 209-219
ISSN: 1094-6136
Publisher: Springer Nature
Indexing
Other information
Authenticus ID: P-002-ST3
Abstract (EN): In production planning, sequence dependent setup times and costs are often incurred for switchovers from one product to another. When setup times and costs do not respect the triangular inequality, a situation may occur where the optimal solution includes more than one batch of the same product in a single period-in other words, at least one sub tour exists in the production sequence of that period. By allowing setup crossovers, flexibility is increased and better solutions can be found. In tight capacity conditions, or whenever setup times are significant, setup crossovers are needed to assure feasibility. We present the first linear mixed-integer programming extension for the capacitated lot-sizing and scheduling problem incorporating all the necessary features of sequence sub tours and setup crossovers. This formulation is more efficient than other well known lot-sizing and scheduling models.
Language: English
Type (Professor's evaluation): Scientific
Contact: almada.lobo@fe.up.pt
No. of pages: 11
Documents
We could not find any documents associated to the publication with allowed access.
Related Publications

Of the same journal

Cyclic staff scheduling: optimization models for some real-life problems (2013)
Article in International Scientific Journal
Marta Rocha; Jose Fernando Oliveira; Maria Antonia Carravilla
Recommend this page Top
Copyright 1996-2024 © Faculdade de Ciências da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2024-09-28 at 04:25:27 | Acceptable Use Policy | Data Protection Policy | Complaint Portal