Go to:
Logótipo
Você está em: Start > Publications > View > Lead time considerations for the multi-level capacitated lot-sizing problem
Publication

Lead time considerations for the multi-level capacitated lot-sizing problem

Title
Lead time considerations for the multi-level capacitated lot-sizing problem
Type
Technical Report
Year
2009
Authors
Christian Almeder
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications Without AUTHENTICUS Without ORCID
Diego Klabjan
(Author)
FEUP
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Scientific classification
FOS: Engineering and technology > Other engineering and technologies
CORDIS: Physical sciences > Computer science > Programming ; Technological sciences > Engineering > Industrial engineering
Other information
Resumo (PT): The classical multi-level capacitated lot-sizing problem is often not suitable to correctly capture resource requirements and precedence relations. We tackle this issue by explicitly modeling these two aspects. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach to deliver more realistic and practically feasible results. Large-scale cases are solved by Benders, which has been enhanced in several novel ways.
Language: Portuguese
Type (Professor's evaluation): Scientific
Contact: almada.lobo@fe.up.pt
No. of pages: 27
License type: Click to view license CC BY-NC
Recommend this page Top
Copyright 1996-2024 © Faculdade de Arquitectura da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2024-10-05 at 09:26:33 | Acceptable Use Policy | Data Protection Policy | Complaint Portal