Investigation on the Relation between the Level of Wind and PV Generation and the Contracted and Mobilized FRR and RR Reserves in Portugal

Título
Investigation on the Relation between the Level of Wind and PV Generation and the Contracted and Mobilized FRR and RR Reserves in Portugal
Tipo
Artigo em Livro de Atas de Conferência Internacional
Ano
2019-09-17
Autores
João Tomé Saraiva
(Autor)
FEUP
Gonçalo Barrias
(Autor)
Outra
Ver página pessoal Sem permissões para visualizar e-mail institucional Pesquisar Publicações do Participante Sem AUTHENTICUS Sem ORCID
Ata de Conferência Internacional
Páginas: 1-5
16th International Conference on the European Energy Market (EEM)
Ljubljana, SLOVENIA, SEP 18-20, 2019
Indexação
Publicação em ISI Web of Knowledge ISI Web of Knowledge - 0 Citações
Publicação em ISI Web of Science ISI Web of Science
Publicação em Scopus Scopus - 0 Citações
Classificação Científica
FOS: Ciências da engenharia e tecnologias > Engenharia electrotécnica, electrónica e informática
CORDIS: Ciências Tecnológicas > Engenharia > Engenharia electrotécnica
Outras Informações
ID Authenticus: P-00R-GRT
Resumo (PT):
Abstract (EN): The Portuguese generation system includes a large amount of wind parks plus a rapidly increasing capacity in PV units. These units as well as some other technologies are classified as Special Regime Generation, SRG, and are paid feed in tariffs. The operation planning for the next day is based on estimates of these injections made in the morning of the day before operation. Then on the operation day, the wind and PV generations will likely be different originating the activation of reserves, namely automatic Frequency Restoration Reserve, aFRR, and Replacement Reserve, RR. Therefore, the main purpose of this paper is to report the research that was conducted to check whether the large amount of wind and PV capacities explain the amounts of contracted and mobilized aFRR and RR reserves. To do this we used data for 2016 publicly available on the web page of the Portuguese TSO. The clarification of this issue is relevant because the amount of money required to pay reserves has been increasing in recent years and this amount is internalized in the Access Tariffs paid by all Portuguese consumers.
Idioma: Inglês
Tipo (Avaliação Docente): Científica
Nº de páginas: 5
Documentos
Não foi encontrado nenhum documento associado à publicação com acesso permitido.
Recomendar Página Voltar ao Topo
Copyright 1996-2025 © Centro de Desporto da Universidade do Porto I Termos e Condições I Acessibilidade I Índice A-Z
Página gerada em: 2025-10-26 às 16:03:30 | Política de Privacidade | Política de Proteção de Dados Pessoais | Denúncias | Livro Amarelo Eletrónico