Saltar para:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Início > Publicações > Visualização > Lotsizing and scheduling in the glass container industry

Lotsizing and scheduling in the glass container industry

Título
Lotsizing and scheduling in the glass container industry
Tipo
Tese
Ano
2007
Classificação Científica
CORDIS: Ciências Tecnológicas > Engenharia > Engenharia industrial
Outras Informações
Resumo (PT): Manufacturing organizations are keen to improve their competitive position in the global marketplace by increasing operational performance. Production planning is crucial to this end and represents one of the most challenging tasks managers are facing today. Among a large number of alternatives, production planning processes help decision-making by tradingoff conflicting objectives in the presence of technological, marketing and financial constraints. Two important classes of such problems are lotsizing and scheduling. Proofs from complexity theory supported by computational experiments clearly show the hardness of solving lotsizing and scheduling problems. Motivated by a real-world case, the glass container industry production planning and scheduling problem is studied in depth. Due to its inherent complexity and to the frequent interdependencies between decisions that are made at and affect different organizational echelons, the system is decomposed into a two-level hierarchically organized planning structure: long-term and short-term levels. This dissertation explores extensions of lotsizing and scheduling problems that appear in both levels. We address these variants in two research directions. On one hand, we develop and implement different approaches to obtain good quality solutions, as metaheuristics (namely variable neighborhood search) and Lagrangian-based heuristics, as well as other special-purpose heuristics. On the other hand, we try to combine new stronger models and valid inequalities based on the polyhedral structure of these problems to tighten linear relaxations and speed up the solution process.
Abstract (EN): Manufacturing organizations are keen to improve their competitive position in the global marketplace by increasing operational performance. Production planning is crucial to this end and represents one of the most challenging tasks managers are facing today. Among a large number of alternatives, production planning processes help decision-making by tradingoff conflicting objectives in the presence of technological, marketing and financial constraints. Two important classes of such problems are lotsizing and scheduling. Proofs from complexity theory supported by computational experiments clearly show the hardness of solving lotsizing and scheduling problems. Motivated by a real-world case, the glass container industry production planning and scheduling problem is studied in depth. Due to its inherent complexity and to the frequent interdependencies between decisions that are made at and affect different organizational echelons, the system is decomposed into a two-level hierarchically organized planning structure: long-term and short-term levels. This dissertation explores extensions of lotsizing and scheduling problems that appear in both levels. We address these variants in two research directions. On one hand, we develop and implement different approaches to obtain good quality solutions, as metaheuristics (namely variable neighborhood search) and Lagrangian-based heuristics, as well as other special-purpose heuristics. On the other hand, we try to combine new stronger models and valid inequalities based on the polyhedral structure of these problems to tighten linear relaxations and speed up the solution process.
Idioma: Português
Tipo (Avaliação Docente): Científica
Contacto: almada.lobo@fe.up.pt
Nº de páginas: 186
Tipo de Licença: Clique para ver a licença CC BY-NC
Documentos
Nome do Ficheiro Descrição Tamanho
Lotsizing and scheduling in the glass container industry 3455.20 KB
Publicações Relacionadas

Dos mesmos autores

Physician emigration: Should they stay or should they go? A policy analysis (2017)
Trabalho Académico
Álvaro Almeida; Mário Lopes; Bernardo Almada Lobo
Programação Linear: Resolução pelo Método Gráfico (2005)
Relatório Técnico
Bernardo Almada Lobo
Lead time considerations for the multi-level capacitated lot-sizing problem (2009)
Relatório Técnico
Christian Almeder; Diego Klabjan; B. Almada-Lobo
Forecasting in Retail Industry (2010)
Relatório Técnico
Pedro Souto; Abdur Rais; B. Almada-Lobo; Luís Carneiro

Ver todas (173)

Das mesmas áreas científicas

O Ensino do Desenho na Licenciatura em Gestão e Engenharia Industrial (2003)
Relatório Técnico
José António dos Santos Almacinha; João Manuel Ribeiro Silva Tavares; Joaquim Oliveira Fonseca; Francisco José de Castro Xavier de Carvalho
Lead time considerations for the multi-level capacitated lot-sizing problem (2009)
Relatório Técnico
Christian Almeder; Diego Klabjan; B. Almada-Lobo

Ver todas (78)

Recomendar Página Voltar ao Topo
Copyright 1996-2025 © Centro de Desporto da Universidade do Porto I Termos e Condições I Acessibilidade I Índice A-Z
Página gerada em: 2025-10-13 às 07:00:17 | Política de Privacidade | Política de Proteção de Dados Pessoais | Denúncias | Livro Amarelo Eletrónico