Publication

A meta-heuristic approach to the unit commitment problem under network constraints

Title
A meta-heuristic approach to the unit commitment problem under network constraints
Type
Article in International Scientific Journal
Year
2008
Authors
Ana Viana
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. View Authenticus page Without ORCID
Bogdan G. Lucus
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Journal
Vol. 2 No. 3
Pages: 449-467
ISSN: 1750-6220
Publisher: Emerald
Indexing
Publicação em ISI Web of Knowledge ISI Web of Knowledge
Scientific classification
CORDIS: Technological sciences > Engineering > Electrical engineering
Other information
Authenticus ID: P-007-NMA
Resumo (PT):
Abstract (EN): Purpose - The purpose of this paper is to solve the problem of committing electric power generators (unit commitment, UC), considering network constraints. Design/methodology/approach - The UC is first solved with a local search based meta-heuristic, following the assumption that all generators and loads are connected to a single network node. For evaluation purposes, the economical production levels of the units committed are computed by running a pre-dispatch algorithm where network constraints are not included. If a good quality solution is reached, an economic dispatch (ED) with network constraints is performed, where the geographic location of generators and loads are considered. Therefore, the production level of each committed generator is performed that leads to the global lowest solution cost, regarding both the generators' costs and constraints and the power system network constraints. Findings - The algorithm proposed is computationally efficient, given the time available for decision making. In addition, the solution for this algorithm, in terms of minimization of total costs, is generally better than the solution of the two phases approach. Some contractual and legal aspects related with the injection in network connections can also be included in the model. Practical implications - UC with network constraints has a large potential of use, especially for small and medium size power systems. It reflects reality in a closer way and provides a more complete and realistic knowledge about the system in operation. Originality/value - The paper presents an approach where theED with network constraints is integrated with the UC procedure. The model described is currently implemented in an EMS package offered in the market - making it a case of successful transfer from science to industry.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 19
Documents
We could not find any documents associated to the publication with allowed access.
Related Publications

Of the same scientific areas

Recolha e tratamento de dados biométricos para a classificação de emoções (2008)
Thesis
Jorge Filipe Pinheiro Guerra de Ribeiro Teixeira; Luis Paulo Reis; Luís Paulo Gonçalves dos Reis; Vasco Hugo Vinhas Gonçalves Moreira; Universidade do Porto. Faculdade de Engenharia
Processadores dedicados : Concepção e realização em sistemas digitais reconfiguráveis (1997)
Thesis
José Carlos dos Santos Alves; José Alfredo Ribeiro da Silva Ma; José Silva Matos

See all (857)

Of the same journal

Impact of special regime generation management on electricity prices: the Portuguese case (2022)
Article in International Scientific Journal
Carlos Alves; Pinto, PD
EU spot prices and industry structure: Assessing electricity market integration (2008)
Article in International Scientific Journal
Patrícia Pereira da Silva; Isabel Soares
Recommend this page Top
Copyright 1996-2025 © Centro de Desporto da Universidade do Porto I Terms and Conditions I Acessibility I Index A-Z
Page created on: 2025-10-09 16:40:46 | Privacy Policy | Personal Data Protection Policy | Whistleblowing | Electronic Yellow Book