Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Publications > View > Probabilistic ramp detection and forecasting for wind power prediction
Publication

Probabilistic ramp detection and forecasting for wind power prediction

Title
Probabilistic ramp detection and forecasting for wind power prediction
Type
Chapter or Part of a Book
Year
2013
Authors
C. Ferreira
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
J. Gama
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Vladimiro Miranda
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page Without ORCID
Audun Botterud
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Indexing
Scientific classification
FOS: Engineering and technology > Electrical engineering, Electronic engineering, Information engineering
CORDIS: Technological sciences > Engineering > Electrical engineering
Other information
Authenticus ID: P-00Q-VPH
Abstract (EN): This chapter proposes a new way to detect and represent the probability of ramping events in short-term wind power forecasting. Ramping is one notable characteristic in a time series associated with a drastic change in value in a set of consecutive time steps. Two properties of a ramp event forecast, that is, slope and phase error, are important from the point of view of the system operator (SO): they have important implications in the decisions associated with unit commitment or generation scheduling, especially if there is thermal generation dominance in the power system. Unit commitment decisions, generally taken some 12-48 h in advance, must prepare the generation schedule in order to smoothly accommodate forecasted drastic changes in wind power availability. © Springer India 2013.
Language: English
Type (Professor's evaluation): Scientific
Documents
We could not find any documents associated to the publication.
Recommend this page Top
Copyright 1996-2024 © Serviços Partilhados da Universidade do Porto I Terms and Conditions I Acessibility I Index A-Z I Guest Book
Page created on: 2024-09-27 14:54:56 | Acceptable Use Policy | Data Protection Policy | Complaint Portal