Go to:
Logótipo
Você está em: Start » Publications » View » Service Restoration for Resilient Distribution Systems Coordinated With Damage Assessment
Publication

Service Restoration for Resilient Distribution Systems Coordinated With Damage Assessment

Title
Service Restoration for Resilient Distribution Systems Coordinated With Damage Assessment
Type
Article in International Scientific Journal
Year
2022
Authors
Bian, YH
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Chen, C
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Huang, YX
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Bie, ZH
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Journal
Vol. 37
Pages: 3792-3804
ISSN: 0885-8950
Publisher: IEEE
Other information
Authenticus ID: P-00X-3CY
Abstract (EN): The time required to restore distribution systems following an extreme event is highly dependent on damage assessment. Waiting for field assessors patrolling the feeders to identify fault locations is a bottleneck in improving restoration efficiency. This paper proposes an optimal service restoration model for resilient distribution systems considering the coordination with damage assessment, as a contribution to earlier studies. The restoration actions such as fault isolation, network reconfiguration, crew mobilization and fault repair are brought forward to the damage assessment stage and the restoration schedules are dynamically updated with the reveal of the damage status. The relationship between fault location, switch status and node status is established to optimize the network topology and guarantee crew operation safety under the condition that the network has multiple faults or unchecked potential faulted areas. Moreover, the crew routing formulations are modified to enable fault isolation and load island reconnection by manual switches during the restoration process. Case studies validate the effectiveness of the proposed model in reducing load shedding and restoration duration.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 13
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same journal

Special Section on Real-World Challenges of TSO-DSO Coordination (2023)
Another Publication in an International Scientific Journal
Catalao, JPS; Hatziargyriou, ND
Fuzzy constraint enforcement and control action curtailment in an optimal power flow - Discussion (1996)
Another Publication in an International Scientific Journal
João Tomé Saraiva
Economically adapted transmission systems in open access schemes - Application of genetic algorithms - Discussion (1996)
Another Publication in an International Scientific Journal
Vladimiro Miranda; Proenca, LM
Economic dispatch model with fuzzy wind constraints and attitudes of dispatchers (2005)
Another Publication in an International Scientific Journal
Vladimiro Miranda; Hang, PS
Discussion of "Integration of price cap and yardstick competition schemes in electrical distribution regulation" (2001)
Another Publication in an International Scientific Journal
João Tomé Saraiva; de Leao, MTP

See all (81)

Recommend this page Top
Copyright 1996-2024 © Faculdade de Medicina da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2024-09-29 at 00:55:24
Acceptable Use Policy | Data Protection Policy | Complaint Portal | Política de Captação e Difusão da Imagem Pessoal em Suporte Digital