Go to:
Logótipo
Você está em: Start > Publications > View > Performance evaluation and benchmarking to inform dispatching rules for hydropower plants
Map of Premises
Principal
Publication

Performance evaluation and benchmarking to inform dispatching rules for hydropower plants

Title
Performance evaluation and benchmarking to inform dispatching rules for hydropower plants
Type
Article in International Scientific Journal
Year
2024
Authors
Barbosa, F
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. View Authenticus page Without ORCID
Casacio, L
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Bacalhau, ET
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Armando Leitão
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page Without ORCID
Journal
Title: Utilities PolicyImported from Authenticus Search for Journal Publications
Vol. 90
ISSN: 0957-1787
Publisher: Elsevier
Indexing
Publicação em ISI Web of Knowledge ISI Web of Knowledge - 0 Citations
Publicação em Scopus Scopus - 0 Citations
Other information
Authenticus ID: P-010-GGS
Abstract (EN): Hydropower currently generates more than all other renewable energies combined. Considering the challenges of climate change and the transition to green energy, it is expected to remain the world's largest source of renewable electricity generation. This paper proposes a tool for performance evaluation and benchmarking of hydropower generation to inform dispatching. Through them, strengths and weaknesses of asset operations can be set, identifying areas with the best performance, gathering insights from their strategies and best practices, and comprehending factors that lead to variations in performance levels. The results allow for optimising energy resource use by indicating the dispatching rules with maximum power production and minimum wearand-tear impact. This framework allows the formulation of practical guidelines for dispatching policies. The proposed methodology is applied to analyse two real-world case studies: the Vogelgr & uuml;n run of river hydropower plant (France) and the Frades 2 pump-storage powerplant (Portugal).
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 8
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same journal

Demand response, market design and risk: A literature review (2020)
Another Publication in an International Scientific Journal
Isabel Soares; Joana Sousa
Performance benchmarking using composite indicators to support regulation of the Portuguese wastewater sector (2020)
Article in International Scientific Journal
Alda A. Henriques; Ana S. Camanho; Pedro Amorim; Jaime G. Silva
Performance analytics for regulation in retail water utilities: Guiding asset management by identifying peers and targets (2023)
Article in International Scientific Journal
Vilarinho, H; D'Inverno, G; Maria Henriqueta Nóvoa; Ana Maria Cunha Ribeiro dos Santos Ponces Camanho
Impact of tertiary reserve sharing in Portugal (2018)
Article in International Scientific Journal
P. M. S. Frade; J. J. E. Santana; M. Shafie-khah; João P. S. Catalão
Exploring tax-related sustainability reporting by electric utilities (2023)
Article in International Scientific Journal
Manuel Castelo Branco; Gomes, D; Martins, A

See all (8)

Recommend this page Top
Copyright 1996-2025 © Faculdade de Medicina Dentária da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z
Page created on: 2025-07-23 at 01:10:46 | Privacy Policy | Personal Data Protection Policy | Whistleblowing | Electronic Yellow Book