Go to:
Logótipo
Você está em: Start > Publications > View > Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries
Map of Premises
Principal
Publication

Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries

Title
Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries
Type
Article in International Scientific Journal
Year
2012
Authors
camargo, vcb
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
toledo, fmb
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Journal
Vol. 63
Pages: 1613-1630
ISSN: 0160-5682
Publisher: Taylor & Francis
Other information
Authenticus ID: P-002-47D
Abstract (EN): In this paper, we propose three novel mathematical models for the two-stage lot-sizing and scheduling problems present in many process industries. The problem shares a continuous or quasi-continuous production feature upstream and a discrete manufacturing feature downstream, which must be synchronized. Different time-based scale representations are discussed. The first formulation encompasses a discrete-time representation. The second one is a hybrid continuous-discrete model. The last formulation is based on a continuous-time model representation. Computational tests with state-of-the-art MIP solver show that the discrete-time representation provides better feasible solutions in short running time. On the other hand, the hybrid model achieves better solutions for longer computational times and was able to prove optimality more often. The continuous-type model is the most flexible of the three for incorporating additional operational requirements, at a cost of having the worst computational performance. Journal of the Operational Research Society (2012) 63, 1613-1630. doi:10.1057/jors.2011.159 published online 7 March 2012
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 18
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same journal

Solving the deterministic and stochastic uncapacitated facility location problem: from a heuristic to a simheuristic (2017)
Article in International Scientific Journal
de Armas, J; Juan, AA; Marques, JM; Joao Pedro Pedroso
Reorder quantities for (Q,R) inventory models (2000)
Article in International Scientific Journal
Bernanrdo C. Vasconcelos; Manuel P. Marques
Productivity change and innovation in Norwegian electricity distribution companies (2012)
Article in International Scientific Journal
Vera L. Miguéis; A. S. Camanho; E. Bjørndal; M. Bjørndal
Performance comparison of retailing stores using a Malmquist-type index (2012)
Article in International Scientific Journal
C. B. Vaz; A. S. Camanho
Performance assessment of secondary schools: the snapshot of a country taken by DEA (2012)
Article in International Scientific Journal
M. C. Portela; A. S. Camanho; Diogo Borges

See all (29)

Recommend this page Top
Copyright 1996-2025 © Faculdade de Medicina Dentária da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2025-07-06 at 15:12:35 | Acceptable Use Policy | Data Protection Policy | Complaint Portal