Go to:
Logótipo
Você está em: Start > Publications > View > Pre-design of a mini CSP plant
Map of Premises
Principal
Publication

Pre-design of a mini CSP plant

Title
Pre-design of a mini CSP plant
Type
Article in International Conference Proceedings Book
Year
2015
Authors
Dirk Krueger
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Armando C. Oliveira
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page View ORCID page
et al.
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Conference proceedings International
Pages: 1613-1622
International Conference on Concentrating Solar Power and Chemical Energy Systems (SolarPACES)
Beijing, PEOPLES R CHINA, SEP 16-19, 2014
Scientific classification
FOS: Engineering and technology
CORDIS: Technological sciences
Other information
Authenticus ID: P-00G-FP1
Abstract (EN): The REELCOOP project funded by the European Union aims at developing and demonstrating three small scale solar electricity generating units with two of them using thermal power cycles and one using PV. The system described here includes parabolic trough collectors and an organic Rankine cycle (ORC), enhanced by a biogas boiler and a thermal storage. With a net aperture area of 979 m(2) the solar field supplies saturated steam at 170 degrees C to the ORC which produces a nominal electrical output of 60 kW. Excess thermal energy will be stored in a novel vertical spiral plate heat exchanger with phase change material. Additionally a biogas boiler can deliver steam at the desired pressure to the ORC. Detailed planning of the hydraulic circuit is ongoing. Several components, mainly solar field and ORC, are under fabrication so that their construction on-site is expected for next winter, followed by commissioning envisaged for March 2015. (C) 2015 The Authors. Published by Elsevier Ltd.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 10
Documents
We could not find any documents associated to the publication.
Recommend this page Top
Copyright 1996-2025 © Faculdade de Medicina Dentária da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2025-06-16 at 16:20:17 | Acceptable Use Policy | Data Protection Policy | Complaint Portal