Construction Processes

Code: EC5275     Acronym: PCONS

Instance: 2004/2005 - 2S

Active? Yes
Responsible unit: Construction Materials Division
Course/CS Responsible: Civil Engineering

Cycles of Study/Courses

Acronym No. of Students Study Plan Curricular Years Credits UCN Credits ECTS Contact hours Total Time
LEC 12 Plano de Estudos EC a partir de 2003 5 3 6 -
P.E. dos Bacharéis de 2003 5 3 6 -
P.E. dos Bacharéis em Eng. Geo. de 2003 5 3 6 -

Teaching language

Portuguese

Objectives

To teach techniques of construction to enable the student to chose the most adequate construction process and equipment for the jobsite.

Program

Aggregates
 Aggregates production operation including blasting, crushing and conveying systems.
 Aggregates from by-products.
 Explosives.
 Crushing and screening mobile equipment.

Construction equipment

Concrete
 Mixing equipment; mixer performance; general requirements.
 Transporting.
 Placing including special process (e.g. preplaced aggregate concrete, underwater concreting, concreting with tremie pipes).
 Preparation of surfaces and reinforcement; joint preparation.
 Methods of consolidation: form vibrators, vibrating tables, surface vibrators, internal vibrators; slipforming; pressure against formwork.
 Revibration.
 Curing and protection: normal curing, accelerated curing; influence of the curing temperature on the strength and durability.
 Concrete temperature control: pre-cooling, post-cooling and insulating systems.
 Shotcrete: general equipment.
 White concrete: mixing, transporting and placing.

Concrete formwork
 Materials for formwork; special types; forms for site precasting; form release agents - influence on the concrete surface.

Lightweight slabs
 Waffle slabs.

Soil improvement
 Injection: equipment, methods and materials.
 Jet-grouting.
 Drainage systems.
 Soil freezing technology.

Anchoring
 Construction practice, equipment, materials, evaluation of the performance of post install mechanical anchors.

Bridges
 Methods employed in bridge construction.

Tunneling
 Blasting, mining and drilling equipment.
 Tunnel Boring Machines.
 NATM - New Austrian Tunneling Method.
 Underground vehicles.
 Lining: shotcrete, cast-in-place concrete and pre-cast concrete rings.

Shafts and chimneys
 Shaft drilling.
 Shaft boring.
 Raise boring.

Uncommon architectonic buildings
 Construction processes.

Main Bibliography

Galabru: Traité de Procédé de Construction.
J. Moura Esteves: Controlo de Vibrações Provocadas por Explosões na Indústria da Construção.
Sousa Coutinho: Fabrico e Propriedades do Betão.
Recursos Geológicos - Legislação.
Case studies from the lecturer's professional activity.

Complementary Bibliography

-

Teaching methods and learning activities

Theoretical and pratical lectures; field trips.

Software

-

Evaluation Type

Evaluation with final exam

Eligibility for exams

Presence in the lectures and at the field trips.

Calculation formula of final grade

Final exam.

Examinations or Special Assignments

-

Special assessment (TE, DA, ...)

Final exam.

Classification improvement

Final exam.

Observations

-