Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Publications > View > Enhancing Stochastic Unit Commitment to Include Nodal Wind Power Uncertainty
Publication

Enhancing Stochastic Unit Commitment to Include Nodal Wind Power Uncertainty

Title
Enhancing Stochastic Unit Commitment to Include Nodal Wind Power Uncertainty
Type
Article in International Conference Proceedings Book
Year
2016
Authors
Pinto, R
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. View Authenticus page Without ORCID
Sumaili, J
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. View Authenticus page Without ORCID
Vladimiro Miranda
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page Without ORCID
Indexing
Other information
Authenticus ID: P-00K-T9P
Abstract (EN): The Unit Commitment (UC) problem consists on the day-ahead scheduling of thermal generation units. The scheduling process is based on a forecast for the demand, which adds uncertainty to the decision of starting or shutting down units. With the increasing penetration of renewable energy sources, namely wind power, the level of uncertainty is such that deterministic UC approaches that rely uniquely on point forecasts are no longer appropriate. The UC approach reported in this paper considers a stochastic formulation and includes constraints for the technical limits of thermal generation units, like ramp-rates and minimum and maximum power output, and also for the power flow equations by integrating the DC model in the optimization process. The objective is to assess the ability of the stochastic UC approach to decrease the expected value of load shedding and wind power loss when compared to the deterministic UC approach. A case study based on IEEE-RTS 79 system, which has 24 buses and 32 thermal generation units, for two different penetrations of wind power and a 24-hour horizon is carried out. The computational performance of the methodology proposed is also discussed to show that considerable performance gains without compromising the robustness of the stochastic UC approach can be achieved.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 5
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same authors

Coping with Wind Power Uncertainty in Unit Commitment: a Robust Approach using the New Hybrid Metaheuristic DEEPSO (2015)
Article in International Conference Proceedings Book
Pinto, R; Leonel Carvalho; Sumaili, J; Pinto, MSS; Vladimiro Miranda
Recommend this page Top
Copyright 1996-2024 © Faculdade de Economia da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2024-09-28 at 22:30:38 | Acceptable Use Policy | Data Protection Policy | Complaint Portal
SAMA2