Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Project/Service Agreement:PTDC/ECM/69697/2006

Project/Service Agreement:PTDC/ECM/69697/2006

Start Approved In Progress Completed Closed

Status
Projeto EncerradoClosed
Publication
PublicadoPublished
General Data
Code: 63617
 
Reference: PTDC/ECM/69697/2006
Short name: PTDC/ECM/69697/2006
Title: Advanced methodologies for the assessment of the dynamic behaviour of high speed railway bridges
Competitive Funding: Yes
Does it involve businesses?:
No. of Participating Institutions: 3
Scope
Type: Funded Project
 
Geographical Scope: National
 
Type of Action: R&TD
Funding
Programme: I&DT - Projectos de I&DT em Todos os Domínios Científicos
Funding Institution: FCT - Fundação para a Ciência e a Tecnologia
Financial Geographical Scope: National
Scheduling
Effective Start Date: 2008-01-01
Expected Completion Date: 2010-12-31
Effective Completion Date: 2011-06-30
Budget
Currency: EUR
 
Total Approved Budget: 125.000,00 EUR
Details
Summary: This project will initiate with improvements to the existing computational program, in terms of its capacities for running dynamic analyses considering the bridge-train interaction. Consequently, it is envisaged that the algorithm of dynamic interaction is extended to structures modelled by shell and volume
elements, the performance of the program is enhanced in terms of calculation times, the library of high speed train models is enlarged with 3D models and with trains of regular type, and implement alternative ways of defining the wheel-rail interface irregularities.
Simultaneously, a set of computational routines will be implemented for the assessment of the structural behaviour of railway bridges. In terms of fatigue, methodologies based on fracture mechanics concepts or on non-linear damage accumulation will be employed. In what respects track safety, new criteria regarding the acceleration of the deck will be implemented to account for the stability of the ballast, recently proposed as an alternative to those indicated in EN1990-A2. In terms of passengers comfort, procedures for its evaluation will be installed based on the
criteria present in ISO2631 standard, in the report of the D190 committee of ERRI, in the UIC 513 sheet and also in ENV 12299:1999. These involve the quantification of comfort indexes based on pondered values of the accelerations at the carriages, as an alternative to EN1991-2 proposal which only takes into account the peak values of this parameter.
The improved dynamic analysis tool and the new assessment methodologies of the structural behaviour will be applied in numerical studies of bridges located in modernized sections of the National railway network and in European high speed railway lines for the traffic of high speed trains. The dynamic behaviour of the bridges will be assessed for the traffic of real high speed trains and for the loading schemes corresponding to the High Speed Load Model, in order to account for the int Ver mais. Adequado para parcelas de texto incompletas e que, através deste ícone, permite-se que o utilizador leia o texto todo.
URL: http://www.fct.mctes.pt/projectos/pub/2006/Painel_Result/vglobal_projecto.asp?idProjecto=69697&idElemConcurso=883
Scientific Context
Scientific Domain (FOS - Level 2): Engineering and technology > Civil engineering

Academic fields (CORDIS - Level 5)

  • Social sciences > Economics > Management studies
  • Technological sciences > Engineering > Civil engineering > Infrastructures engineering

Keywords

  • Comportamento dinâmico
  • Experimentação e modelação
  • Fiabilidade estrutural
  • Pontes ferroviárias em linhas de alta velocidade
Documents
Mais informações There are no Documents associated with the Project.

Publications associated with the Project

Article in International Scientific Journal
P. Delgado (Author) (Other); A. Monteiro (Author) (FEUP); A. Arêde (Author) (FEUP); N. Vila Pouca (Author) (FEUP); R. Delgado (Author) (FEUP); A. Costa (Author) (Other)
2011
Institutions Participating in the Project
Institution Contact Create Tab?
Name Short name Country Type Participation Name Telephone Email
Faculdade de Engenharia da Universidade do Porto FEUP Portugal University Proponent Rui Calçada ruiabc@fe.up.pt
Rede Ferroviária de Alta Velocidade, S.A. RAVE Portugal Company Partner
Rede Ferroviária Nacional, REFER EP REFER Portugal Status Partner
 
Budgets and Teams
Approved Budget: 125.000,00 EUR
Approved Funded Amount: 125.000,00 EUR
Approved co-funded Amount: -
Funding Rate: -
Confidential Budget:

People in the Project

Institution Name Short name Role Dedication (%) Contribution (%) Allocation
Start date End date
FEUP António Abel Ribeiro Henriques AARH Researcher 20 20
FEUP Diogo Rodrigo Ferreira Ribeiro DRFR Researcher 100
FEUP Joaquim Gabriel Magalhães Mendes JG Researcher 0 20
FEUP Paulo Manuel Salgado Tavares de Castro PTC Researcher 10 10
FEUP Raimundo Moreno Delgado RD Researcher 15 15
FEUP Rui Artur Bártolo Calçada RBC Official Researcher at the OU 35 35

Technicians in the Project

Mais informações There are no Technicians associated with the Project.
Laboratories
Mais informações There are no Laboratories associated with the Project.
Recommend this page Top
Copyright 1996-2024 © Faculdade de Economia da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2024-07-16 at 17:51:17 | Acceptable Use Policy | Data Protection Policy | Complaint Portal
SAMA2