A novel TSO settlement scheme for the Frequency Containment Reserve Cooperation in Europe's integrated electricity market

Title
A novel TSO settlement scheme for the Frequency Containment Reserve Cooperation in Europe's integrated electricity market
Type
Article in International Scientific Journal
Year
2024
Authors
Ribeiro, FJ
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. View Authenticus page Without ORCID
João Peças Lopes
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page View ORCID page
Soares, FJ
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. View Authenticus page Without ORCID
Madureira, AG
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Journal
Title: Utilities PolicyImported from Authenticus Search for Journal Publications
Vol. 91
ISSN: 0957-1787
Publisher: Elsevier
Indexing
Publicação em ISI Web of Knowledge ISI Web of Knowledge - 0 Citations
Publicação em Scopus Scopus - 0 Citations
Other information
Authenticus ID: P-016-ZBQ
Abstract (EN): Frequency Containment Reserve (FCR) Cooperation is a European effort to integrate several countries in an integrated international electricity market platform for FCR procurement. In this market, Balancing Service Providers (BSPs) are on the supply side and Transmission System Operators (TSOs) on the demand side. This paper proposes a novel settlement scheme for sharing costs among TSOs; it proposes no changes to existing market clearing rules or to the existing settlement of the BSPs' revenues. It is shown that the current TSO settlement scheme is an inequitable mechanism that originates negative costs for some TSOs in specific conditions, which are extensively discussed. The proposed TSO settlement scheme overcomes these inequities. In the proposed scheme, TSOs begin paying the local BSPs for the cleared bids needed locally, and the remaining imports are calculated in a subsequent step. Doing so avoids using the so-called import/export costs, which are demonstrated to be the source of the inequities in the current scheme. It is shown that if the proposed pricing scheme had been adopted from July 2019 to December 2022, all TSOs would have been affected. Specifically, the most negatively impacted TSO would have its accumulated costs increased by 16% and the most positively impacted TSO would have its accumulated cost decreased by 32%. The inequities of the current mechanism amount to more than 50 Me or 7.4% of the total accumulated costs. Although the proposed mechanism is tested here under the FCR Cooperation, it can be applied to other markets where the rules allow different local settlement prices.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 14
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same authors

VPP Participation in the FCR Cooperation Considering Opportunity Costs (2024)
Article in International Scientific Journal
Ribeiro, FJ; João Peças Lopes; Soares, FJ; Madureira, AG

Of the same journal

Demand response, market design and risk: A literature review (2020)
Another Publication in an International Scientific Journal
Isabel Soares; Joana Sousa
Performance evaluation and benchmarking to inform dispatching rules for hydropower plants (2024)
Article in International Scientific Journal
Barbosa, F; Casacio, L; Bacalhau, ET; Armando Leitão; Luis Guimarães
Performance benchmarking using composite indicators to support regulation of the Portuguese wastewater sector (2020)
Article in International Scientific Journal
Alda A. Henriques; Ana S. Camanho; Pedro Amorim; Jaime G. Silva
Performance analytics for regulation in retail water utilities: Guiding asset management by identifying peers and targets (2023)
Article in International Scientific Journal
Vilarinho, H; D'Inverno, G; Maria Henriqueta Nóvoa; Ana Maria Cunha Ribeiro dos Santos Ponces Camanho
Impact of tertiary reserve sharing in Portugal (2018)
Article in International Scientific Journal
P. M. S. Frade; J. J. E. Santana; M. Shafie-khah; João P. S. Catalão

See all (8)

Recommend this page Top
Copyright 1996-2025 © Faculdade de Direito da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z
Page created on: 2025-07-28 at 11:56:31 | Privacy Policy | Personal Data Protection Policy | Whistleblowing