Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Publications > View > Production planning and scheduling in the glass container industry: A VNS approach
Publication

Publications

Production planning and scheduling in the glass container industry: A VNS approach

Title
Production planning and scheduling in the glass container industry: A VNS approach
Type
Article in International Scientific Journal
Year
2008
Journal
Vol. 114 No. 1
Pages: 363-375
ISSN: 0925-5273
Publisher: Elsevier
Indexing
Publicação em ISI Web of Science ISI Web of Science
COMPENDEX
INSPEC
Scientific classification
FOS: Engineering and technology > Civil engineering
Other information
Authenticus ID: P-003-Y41
Abstract (EN): Inspired by a case study, this paper reports a successful application of VNS to the production planning and scheduling problem that arises in the glass container industry. This is a multi-facility production system, where each facility has a set of furnaces where the glass paste is produced in order to meet the demand, being afterwards distributed to a set of parallel molding machines. Since the neighborhoods used are not nested, they are not ordered by increasing sizes, but by means of a new empirical measure to assess the distance between any two solutions. Neighborhood sizes decrease significantly through-out the search thus suggesting the use of a scheme in which efficiency is placed. over effectiveness in a first step, and the opposite in a second step. We test this variant as well as other two with a real-world problem instance from our case study.
Language: English
Type (Professor's evaluation): Scientific
Contact: almada.lobo@fe.up.pt
Notes: DOI: 10.1016/j.ijpe.2007.02.052
No. of pages: 13
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same authors

Single machine multi-product capacitated lot sizing with sequence-dependent setups (2007)
Article in International Scientific Journal
Bernardo Almada Lobo; Diego Klabjan; Maria Antónia Carravilla; José F. Oliveira
Multiple machine continuous setup lotsizing with sequence-dependent setups (2010)
Article in International Scientific Journal
Bernardo Almada Lobo; Diego Klabjan; Maria Antónia Carravilla; José F. Oliveira
A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times (2008)
Article in International Scientific Journal
Bernardo Almada Lobo; Jose F Oliveira; Maria Antonia Carravilla
VNS for glass container industry Capacitated Lotsizing problem (2007)
Article in International Conference Proceedings Book
Bernardo Almada Lobo; Maria Antónia Carravilla; José Fernando Oliveira

Of the same journal

Tactical sales and operations planning: A holistic framework and a literature review of decision-making models (2020)
Another Publication in an International Scientific Journal
Daniel Filipe Pereira; José Fernando Oliveira; Maria Antónia Carravilla
Cutting and packing (2013)
Another Publication in an International Scientific Journal
Julia A Bennell; Jose Fernando Oliveira; Gerhard Waescher
The Dotted-Board Model: A new MIP model for nesting irregular shapes (2013)
Article in International Scientific Journal
Franklina M B Toledo; Maria Antonia Carravilla; Cristina Ribeiro; Jose F Oliveira; Miguel M Gomes
The adjustment-cost model of the firm: Duality and productive efficiency (2015)
Article in International Scientific Journal
Elvira Silva; Lansink, AO; Stefanou, SE
Supply chain social sustainability: Standard adoption practices in Portuguese manufacturing firms (2018)
Article in International Scientific Journal
Mani, V; Gunasekaran, A; Catarina Delgado

See all (25)

Recommend this page Top
Copyright 1996-2025 © Faculdade de Direito da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z
Page created on: 2025-08-09 at 20:56:24 | Privacy Policy | Personal Data Protection Policy | Whistleblowing