Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Publications > View > Estimation of the remuneration of hydro plants in a market environment using an iterative under-relaxation approach
Publication

Publications

Estimation of the remuneration of hydro plants in a market environment using an iterative under-relaxation approach

Title
Estimation of the remuneration of hydro plants in a market environment using an iterative under-relaxation approach
Type
Article in International Conference Proceedings Book
Year
2009
Authors
José Carlos Sousa
(Author)
FEUP
Virgílio Torrado Mendes
(Author)
FEUP
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
João Tomé Saraiva
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page View ORCID page
Conference proceedings International
Pages: 2157-2162
Bucharest PowerTech Conference
Bucharest, ROMANIA, JUN 28-JUL 02, 2009
Indexing
Publicação em ISI Proceedings ISI Proceedings
Publicação em ISI Web of Knowledge ISI Web of Knowledge - 0 Citations
Publicação em ISI Web of Science ISI Web of Science
INSPEC
Scientific classification
FOS: Engineering and technology > Electrical engineering, Electronic engineering, Information engineering
CORDIS: Technological sciences
Other information
Authenticus ID: P-003-T4X
Abstract (EN): One of the challenges that generation companies having hydro stations are facing corresponds to build the most adequate bids to send to day-ahead markets, maximizing their profit and taking into account the expect inflows, market prices and the interdependency between hydro plants in cascades. As a contribution to address this problem, this paper describes a short-term optimization model to build one-week schedules for a set of hydro power plants so that the outputs can be used to bid in the day-ahead market. This model is coordinated with a medium-scale (one year) model that inputs the value of using the water in the short-term problem. The developed model considers the non-linear relationship between the electric power, the net head and the turbine discharge and it takes in consideration pumping as well. The solution approach is based on an under-relaxed iterative procedure based on the algorithm described in [1] and the players are considered as price-takers, so that market prices are input variables. To solve the medium-term problem we propose a similar model that sends information about the final week volumes of each power plant to the short-term problem. On the other hand, we conducted a scenario analysis regarding market prices and inflows to internalize uncertainty. Finally, the model was successfully applied to a real size Portuguese cascade and the paper includes several results to illustrate the application of the developed models.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 6
Documents
We could not find any documents associated to the publication with allowed access.
Related Publications

Of the same authors

A Simulated Annealing based approach to solve the generator maintenance scheduling problem (2011)
Article in International Scientific Journal
João Tomé Saraiva; Marcelo Leandro Pereira; Virgílio Torrado Mendes; José Carlos Sousa
Preventive generation maintenance scheduling- A simulated annealing approach to use in competitive markets (2010)
Article in International Conference Proceedings Book
João Tomé Saraiva; Marcelo Pereira; Virgílio Torrado Mendes; José Carlos Sousa

Of the same scientific areas

E3.1 – Relatório: “Interfaces: Identificação e caracterização de necessidades/oportunidades de integração/interoperabilidade” (2021)
Technical Report
Hipólito Sousa; Joaquim Moreira; Jorge Teixeira; José Ferreira; Yanh Ribeiro
Image Processing and Analysis in Biomechanics (2010)
Another Publication in an International Scientific Journal
João Manuel R. da Silva Tavares; Renato M. Natal Jorge

See all (99)

Recommend this page Top
Copyright 1996-2025 © Faculdade de Direito da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z
Page created on: 2025-07-14 at 22:20:35 | Privacy Policy | Personal Data Protection Policy | Whistleblowing