Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Publications > View > An exact approach to early/tardy scheduling with release dates
Publication

Publications

An exact approach to early/tardy scheduling with release dates

Title
An exact approach to early/tardy scheduling with release dates
Type
Article in International Scientific Journal
Year
2005
Journal
Vol. 32
Pages: 2905-2917
ISSN: 0305-0548
Publisher: Elsevier
Indexing
Scientific classification
FOS: Engineering and technology > Civil engineering
CORDIS: Social sciences > Economics > Management studies
Other information
Authenticus ID: P-000-0KZ
Abstract (EN): In this paper, we consider the single machine earliness/tardiness scheduling problem with different release dates and no unforced idle time. The problem is decomposed into weighted earliness and weighted tardiness subproblems. Lower bounding procedures are proposed for each of these subproblems, and the lower bound for the original problem is the sum of the lower bounds for the two subproblems. The lower bounds and several version, of a branch-and-bound algorithm are then tested on a set of randomly generated problems, and instances with up to 30 jobs are solved to optimality. To the best of our knowledge, this is the first exact approach for the early/tardy scheduling problem with release dates and no unforced idle time.
Language: English
Type (Professor's evaluation): Scientific
Contact: jvalente@fep.up.pt
No. of pages: 13
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same authors

Estudo de Algumas Variantes do Problema Early/Tardy (2002)
Article in National Scientific Journal
Jorge M. S. Valente; Rui A. F. S. Alves
A Note on Polynomially-Solvable Cases of Common Due Date Early-Tardy Scheduling with Release Dates (2004)
Article in National Scientific Journal
Jorge M. S. Valente; Rui A. F. S. Alves
Improved lower bounds for the early/tardy scheduling problem with no idle time (2005)
Article in International Scientific Journal
Valente, JMS; Alves, RAFS
Improved heuristics for the early/tardy scheduling problem with no idle time (2005)
Article in International Scientific Journal
Valente, JMS; Alves, RAFS
Heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties (2008)
Article in International Scientific Journal
Jorge M S Valente; Rui A F S Alves

See all (13)

Of the same scientific areas

Minimizing the weighted sum of squared tardiness on a single machine (2012)
Article in International Scientific Journal
Jeffrey Schaller; Jorge M S Valente
Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties (2010)
Article in International Scientific Journal
Jorge M S Valente; Jeffrey E Schaller
Improved heuristics for the early/tardy scheduling problem with no idle time (2005)
Article in International Scientific Journal
Valente, JMS; Alves, RAFS

See all (19)

Of the same journal

Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines (2015)
Article in International Scientific Journal
Marcos Furlan; Bernardo Almada Lobo; Maristela Santos; Reinaldo Morabito
The use of frontier techniques to identify efficient solutions for the Berth Allocation Problem solved with a hybrid evolutionary algorithm (2019)
Article in International Scientific Journal
Flávia Barbosa; Priscila C. Berbert Rampazzo; Akebo Yamakami; Ana S. Camanho
The Probabilistic Travelling Salesman Problem with Crowdsourcing (2022)
Article in International Scientific Journal
Santini, A; Viana, A; Klimentova, X; Joao Pedro Pedroso
The challenges of estimating the impact of distributed energy resources flexibility on the TSO/DSO boundary node operating points (2018)
Article in International Scientific Journal
João Silva; Jean Sumaili ; Ricardo J. Bessa; Luís Seca ; Manuel Matos; Vladimiro Miranda

See all (43)

Recommend this page Top
Copyright 1996-2025 © Faculdade de Direito da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z  I Guest Book
Page created on: 2025-07-01 at 02:30:19 | Acceptable Use Policy | Data Protection Policy | Complaint Portal