Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Publications > View > Performance analysis of job-shop production systems under different order release control parameters
Publication

Publications

Performance analysis of job-shop production systems under different order release control parameters

Title
Performance analysis of job-shop production systems under different order release control parameters
Type
Article in International Conference Proceedings Book
Year
2007
Conference proceedings International
Pages: 1056-1061
World Congress on Engineering 2007
London, ENGLAND, JUL 02-04, 2007
Indexing
Publicação em ISI Proceedings ISI Proceedings
Publicação em ISI Web of Knowledge ISI Web of Knowledge - 0 Citations
Scientific classification
FOS: Natural sciences > Computer and information sciences
CORDIS: Social sciences > Economics > Management studies
Other information
Authenticus ID: P-004-EV2
Abstract (EN): Controlling the flow of materials inside job-shops involves several decisions such as the acceptance or rejection of an incoming order, the order's due date definition, the releasing and the dispatching of the job. This study applies a multiple decision-making scheme involving these four decision phases to examine the sensitivity of job-shop performance to different order release parameters. The performance criteria of shop workload and order delivery were collected to demonstrate the influence of the most significant order release parameters: the queue workload limit and the planning parameter of the latest release date. The influence of each parameter is evaluated by computational simulations. The way we compute the machine workload limit affects not only the workload but also delivery performance measures. However, surprisingly, the latest release date has not a significant impact on shop-floor performance measures. The effect of the queue workload limit in an input-output control. mechanism on delivery and workload related performance measures had not been studied up to date. Neither any analysis had investigated the influence of the latest release date calculus on the performance of the job-shop.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 6
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same authors

Defining a storage policy when there are handling constraints: a case study analysis (2020)
Summary of Presentation in an International Conference
Moreira, Maria do Rosário Alves; Sousa, PSA; Trindade, Maria Alice Moreira
What Can be Learned from More Than 100 Case Studies of Lean in Services? (2023)
Article in International Scientific Journal
Pereira, Diana Isabel Pinto; Sousa, PSA; Moreira, Maria do Rosário Alves
The relationship between leadership style and the success of Lean management implementation (2018)
Article in International Scientific Journal
da Costa Nogueira, DMD; Sousa, PSA; Moreira, MRA
Relationship between Firm Size and Export Performance: An Exploratory Analysis (2013)
Article in International Scientific Journal
Tatiana M. C. Monteiro; Maria do Rosário Moreira; Paulo Sérgio Amaral de Sousa
Ramping up a heuristic procedure for storage location assignment problem with precedence constraints (2022)
Article in International Scientific Journal
Trindade, MAM; Sousa, PSA; Moreira, MRA

See all (26)

Of the same scientific areas

Hybrid heuristics for the single machine scheduling problem with quadratic earliness and tardiness costs (2012)
Article in International Scientific Journal
Alok Singh; Jorge M S Valente; Maria R A Moreira
Biased random-key genetic algorithms for combinatorial optimization (2011)
Article in International Scientific Journal
Jose Fernando Goncalves; Mauricio G C Resende
A parallel multi-population genetic algorithm for a constrained two-dimensional orthogonal packing problem (2011)
Article in International Scientific Journal
Jose Fernando Goncalves; Mauricio G C Resende
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem (2011)
Article in International Scientific Journal
Jose Fernando Goncalves; Mauricio G C Resende; Jorge J M Mendes
Multi-perspective challenges on collaborative networks business environments (2005)
Article in International Conference Proceedings Book
Chituc, CM; Azevedo, AL

See all (7)

Recommend this page Top
Copyright 1996-2025 © Faculdade de Direito da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z
Page created on: 2025-07-08 at 06:50:00 | Privacy Policy | Personal Data Protection Policy | Whistleblowing