Investigation on the Relation between the Level of Wind and PV Generation and the Contracted and Mobilized FRR and RR Reserves in Portugal

Title
Investigation on the Relation between the Level of Wind and PV Generation and the Contracted and Mobilized FRR and RR Reserves in Portugal
Type
Article in International Conference Proceedings Book
Year
2019-09-17
Authors
João Tomé Saraiva
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page View ORCID page
Gonçalo Barrias
(Author)
Other
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications Without AUTHENTICUS Without ORCID
Conference proceedings International
Pages: 1-5
16th International Conference on the European Energy Market (EEM)
Ljubljana, SLOVENIA, SEP 18-20, 2019
Indexing
Publicação em ISI Web of Knowledge ISI Web of Knowledge - 0 Citations
Publicação em ISI Web of Science ISI Web of Science
Publicação em Scopus Scopus - 0 Citations
Scientific classification
FOS: Engineering and technology > Electrical engineering, Electronic engineering, Information engineering
CORDIS: Technological sciences > Engineering > Electrical engineering
Other information
Authenticus ID: P-00R-GRT
Resumo (PT):
Abstract (EN): The Portuguese generation system includes a large amount of wind parks plus a rapidly increasing capacity in PV units. These units as well as some other technologies are classified as Special Regime Generation, SRG, and are paid feed in tariffs. The operation planning for the next day is based on estimates of these injections made in the morning of the day before operation. Then on the operation day, the wind and PV generations will likely be different originating the activation of reserves, namely automatic Frequency Restoration Reserve, aFRR, and Replacement Reserve, RR. Therefore, the main purpose of this paper is to report the research that was conducted to check whether the large amount of wind and PV capacities explain the amounts of contracted and mobilized aFRR and RR reserves. To do this we used data for 2016 publicly available on the web page of the Portuguese TSO. The clarification of this issue is relevant because the amount of money required to pay reserves has been increasing in recent years and this amount is internalized in the Access Tariffs paid by all Portuguese consumers.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 5
Documents
We could not find any documents associated to the publication with allowed access.
Recommend this page Top
Copyright 1996-2025 © Faculdade de Direito da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z
Page created on: 2025-07-26 at 03:57:23 | Privacy Policy | Personal Data Protection Policy | Whistleblowing