Go to:
Logótipo
Comuta visibilidade da coluna esquerda
Você está em: Start > Publications > View > Assessing the impact of performance determinants in complex MTO/ETO supply chains through an extended hybrid modelling approach
Publication

Publications

Assessing the impact of performance determinants in complex MTO/ETO supply chains through an extended hybrid modelling approach

Title
Assessing the impact of performance determinants in complex MTO/ETO supply chains through an extended hybrid modelling approach
Type
Article in International Scientific Journal
Year
2019
Authors
Cátia Barbosa
(Author)
Other
The person does not belong to the institution. The person does not belong to the institution. The person does not belong to the institution. Without AUTHENTICUS Without ORCID
Américo Azevedo
(Author)
FEUP
View Personal Page You do not have permissions to view the institutional email. Search for Participant Publications View Authenticus page Without ORCID
Journal
Vol. 57 No. 11
Pages: 3577-3597
ISSN: 0020-7543
Publisher: Taylor & Francis
Other information
Authenticus ID: P-00P-TXA
Abstract (EN): In make-to-order (MTO)/engineer-to-order (ETO) business environments multiple customer-oriented projects compete for and share resources through interdependent engineering and production activities. Deep knowledge of critical dimensions that affect performance is key in this context. For this, we propose a set of determinants - workload, complexity, outsourcing, design reuse, project type, and knowledge/experience with technology, that impact performance. These determinants are input to an extended hybrid simulation model using system dynamics (SD), discrete event simulation (DES) and agent-based simulation (ABS) that tackles the needs imposed by activities of very different nature, as the project development and manufacturing/assembly operations. The hybrid model is applied to the case of an advanced manufacturing company. Through Monte Carlo sampling, the influence of different combinations of determinants in the performance variability is assessed. A correlation analysis shows evidence of association between all performance determinants and the project time and cost, while no evidence of association between the design reuse and project type determinants and the manufacturing and assembly time.
Language: English
Type (Professor's evaluation): Scientific
No. of pages: 21
Documents
We could not find any documents associated to the publication.
Related Publications

Of the same authors

Hybrid modelling of MTO/ETO manufacturing environments for performance assessment (2018)
Article in International Scientific Journal
Cátia Barbosa; Américo Azevedo
Towards an Integrated Framework for Aerospace Supply Chain Sustainability (2019)
Article in International Conference Proceedings Book
Américo Azevedo; Nuno Falcão e Cunha; Cátia Barbosa; Carlos Malarranha; Telmo Pinto; Ana Carvalho; Pedro Amorim; M. Sameiro Carvalho; Susana Relvas; Tânia Pinto Varela; Ana cristina Barros; Filipe Alvelos; Cláudio Alves; Jorge Pinho de Sousa; Bernardo Almada Lobo; José Valério de Carvalho; Ana Barbosa Póvoa
Towards a hybrid multi-dimensional simulation approach for performance assessment of MTO and ETO manufacturing environments (2018)
Article in International Conference Proceedings Book
Cátia Barbosa; Américo Azevedo

Of the same journal

Production scheduling in the context of Industry 4.0: review and trends (2020)
Another Publication in an International Scientific Journal
Parente, M; figueira, g; Pedro Amorim; Marques, A
Lot sizing and scheduling: industrial extensions and research opportunities (2011)
Another Publication in an International Scientific Journal
clark, a; almada-lobo, b; almeder, c
The integrated lot-sizing and cutting stock problem under demand uncertainty (2023)
Article in International Scientific Journal
Curcio, E; de Lima, VL; Miyazawa, FK; Silva, E; Pedro Amorim
Tackling perishability in multi-level process industries (2019)
Article in International Scientific Journal
Wenchao Wei; Pedro Amorim; Luís Guimarães; Bernardo Almada Lobo
Synchronisation of scarce resources for a parallel machine lotsizing problem (2011)
Article in International Scientific Journal
almeder, c; almada-lobo, b

See all (38)

Recommend this page Top
Copyright 1996-2025 © Faculdade de Direito da Universidade do Porto  I Terms and Conditions  I Acessibility  I Index A-Z
Page created on: 2025-08-08 at 04:09:02 | Privacy Policy | Personal Data Protection Policy | Whistleblowing