Abstract (EN):
Due to the uncertainty and stochastic behavior of wind and photovoltaic production introduced in conventional power systems, the correct overall management considering all the technical and economic constraints is faced with more challenges. To address also the specificities of insular power systems, several strategies have been proposed in last years, including energy storage systems with the aim of increasing system flexibility. Accurate forecasting tools may also help to reduce overall uncertainty. Other scheduling tools based on probabilistic, heuristic and stochastic programming have also been considered. In this work, a new scheduling strategy is proposed considering the integration of wind production in an insular power system. To this end, some arbitrarily chosen scenarios from wind production are introduced in the scheduling process, and a comparative study is carried out, with and without renewable production, providing an acceptable computational time.
Language:
English
Type (Professor's evaluation):
Scientific
No. of pages:
5